African case


Tianji Environmental signed the supply of indoor climate equipment for the medical device factory in Abuja, Africa.
The project requires the humidity to be controlled at 20% throughout the year, and it also needs to meet the requirements of a 10,000-level purification unit.
After the customer compared many options, they chose the climate system provided by us.

At the same time, Tianji Environmental will do the full system design for it.




Prev:Nanchang 3000 square meters single family
Next:48 Ling Wu Xuan, Kowloon Lake